Time And Work, Formula And Basic Tricks

The time needed by one or more than one person to complete a job or time for which a person(s) actually worked on the assigned job is called time. Work: The amount of total work (assigned) or the part of total work actually done.

MaNiSH Manevandra
updated: 23 May 2022

In most of the problems on time and work, one of the following basic parameters is to be calculated:

Time: Time needed by one or more than one person to complete a job or time for which a person(s) actually worked on the assigned job.

Alone time : Time needed by single person to complete a job.

Work : The amount of total work (assigned) or the part of total work actually done.


Basic concepts :

Total amount of a complete job (or assigned job) = 1, always , unless specified.

If any person `M’ completes a job alone in t days , then alone time for `M’ = t

1 day’s work by any person \(={1 \over alone \ time}th \) part of total work

When more than one person working on the same piece of work, then their combined 1 day’s work = sum of 1 day’s work by each person.

i.e , if a A ,B and C are three persons working on job, then (A + B + C)’s 1 day’s work = A’s 1 day’s work + B’s 1 days work + c’s 1 day’s work.


The reciprocal of the combined 1 day’s work gives the time for completion by the person working together.

i.e , time for completion \(= {1 \over combined \ 1 \ day’s} \) work .

It implies that,

If three person, says A ,B, and C are working Job,then,

Time for completion by them = ((A+B+C)’s 1 day’s work)




Notes

Time and Work: Important formulas and solved problems

1 Jan 1970

Important formulas :

If A can do a piece of work in X days and B can do the same work in Y days, then both of them working together will do the same work in \( {xy \over x + y} \) Days
A, B , C while working alone can complete a work x, y, and Z days respectively then they will together complete the work in \( { XYZ \over XY + YZ + ZX } \) Days


Example 1: If man A completes a piece of work in 12 days & the same work is completed by B & C in 15 days respectively. In how many days the work is completed work together?
Solution: Work per day of A , B and C \( = {1 \over 12} + {1 \over 15 } + {1 \over 20} \)
\( = { (5 + 4 + 3) \over 60 } = {1 \over 5 } \)
Total days = 5 days (Answer)


Formula method :
They together complete the work
\( = { XYZ \over (XY + YZ + ZX) }\)
\( = {12 \times 15 \times 20 \over 12 \times 15 + 15 \times 20 + 20 \times 12} \)

= 5 days (answer)

Two - person A and B working together, can complete a piece of work in X days. If A alone can complete the work in Y days, then B working will complete the work in \( {xy \over x - y} \)Days


Example 2 : A and B together can do a piece of work in 5 days, A alone can do it in 8 days. B alone can do the same piece of work in?
Solution:
Hence, (A + B ) = 5 days , A = 8 days
B alone can finish the work in one day
\( = {1 \over 5 } - {1 \over 8 } \)
\( = {8 - 5 \over 40 } \)
B finish the whole work \( = { 40 \over 3 } \) Days
\( = 13 {1 \over 3 } Days (answer) \)


Formula method :
By formula ,
\( = {xy \over x - y } \)
\( = {8 \times 5 \over 8 - 5 } \)
\( = 13 { 1 \over 3 } \) days (Answer)

If A and B working together, can finish a piece of work in X days, B and c in days, c and A in Z days then,
- A, B and C working together will finish the job in
\( ={ 2XYZ \over XY + YZ + ZX } \) Days

Example 3: A and B can complete a piece of work in 8 days 12 days B and C can do it in 8 days, A, B, and C together can complete it in?

Solution: Work done by A and B in one day \( = {1 \over 8} \)
Work done by B & C in one day \( = {1 \over 12} \)
Work done by C and A in 1 day \( = {1 \over 8} \)
Work done by A , B and C together in 1 day
\( = {1 \over 2} ( {1 \over 8} + {1 \over 12} + {1 \over 8} )= {1 \over 6 } \)
A, B and C together complete the whole job = 6 days


Formula method :
A + B + C can do finish the whole work
\( = { 2XYZ \over XY + YZ + ZX } \)
\( = { 2 \times 8 \times 12 \times 8 \over 8 \times 12 + 12 \times 8 + 8 \times 8 } \)
\( = { 2 \times 8 \times 12 \times 8 \over 96 + 96 + 64 } \)
= 6 days ( answer )

Work efficiency of any worker inversely proportional to the time taken by him.
i.e work efficiency \( α = {1 \over Time} \)


Example 4: A is twice as good workman as B & together they finish a piece of work in 18 days. In how many days will A alone finish the work?

Solution: A : B = 2:1
Time is taken A and B = 18 days
Work done by A and B \( = 18 \times 3 = 54 \) days

A will do alone \( = { 54 \over 2 } = 27 \) days


Man – work - Hour - formula :

  1. More man can do more work
  2. More work means more times required to do work
  3. More man can do some work in less time


If M1 can do W1 work. In D1 days working H1 hr/day for Rs. R1 and M2 man can do W2 work in D2 days working H2 hr/day for Rs. R2 Then,
The formula is given as:
\( { M1 \times D1 \times H1 \over w1 \times R1 } = { M2 \times D2 \times H2 \over W2 \times R2 } \)
Where,
M = no. of person
D = no. Of days
H = no. Of hours
W = work
R = rate(in Rs.)


Example 5: If 10 men complete half work in 12 days when they work 8 hours per day, In how many days 18 men complete the full work when they work 6 hours \over day?

Solution: By formula

\( { M1 \times D1 \times H1 \over w1 } = { M2 \times D2 \times H2 \over W2 } \)

\( {10 \times 12 \times 8 \over {1 \over 2}} \) \( = {18 \times D2 \times 6 \over 1} \)
\(
10 \times 12 \times 8 \times 2 = 18 \times D2 \times 6 \)

\( D2 = {160 \over 9} \) \( = 17{7 \over 9} \) Days (Ans)


If a men or b women can do a piece of work in d days then x men and y women together finish the whole work :
\( D = {a \times b \times d \over xb + ya} \)
If men or b women or c child women can do a piece of work in d days then x men, y women, and z children together finish the whole work :
\( {D = a \times b \times c \times d \over xbc + yac + zab} \)


Example 6 : 3 men or 4 women can do a piece of work in 43 Days. In how many days 7 men & 5 women can do The same work?

Solution: 3m or 4w = 43 days
7m + 5 w = ?

From formula :
M1 D1 = M2 D2
\( 3 m \times 43 = (7m + 5w) \times D2 \)
\( 129 m = {7m + 15 \over 4 m} \times D2 \)
\( 129 m = {43m \over 4} \times D2 \)
D2 = 12 days ( answer)


Short trick :
\( D = {a \times b \times d \over xb + ya} \)
\( D = {3 \times 4 \times 43 \over 28 + 15} \) = 12 days (answer)

Example 7: 1 man or 2 boys or 3 girls can do a piece of work In 88 days . In how many days one man , one boy And one girl can do the same work ?

Solution: 1m = 2b = 3g = 88 days
(1m + 1b + 1g)= ?
From formula :
M1 D1 = M2 D2
\( 3g \times 88 = (1m + 1b + 1g) \times D2 \)

\( 3g \times 88 = {3g + 3 \over 2g + 1g}D2 \)

\( 3g \times 88 = {6g + 3g + 2g \over 2}D2 \)

\( 3g \times 88 = {11 \over 2 g \times D2} \)

D2 = 48 days (answer)

Short trick :
\( D = {a \times b \times c \times d \over xbc + yac + zab \)
\( D =
{1 \times 2 \times 3 \times 88 \over 6 + 2 + 3} \)
48 days (answer)
SIMILAR FOR YOU

Videos from Youtube 〉

Time and Work Short Tricks/Problems | समय और कार्य का खेल | Part-1 SSC CGL, KVS, Bank PO, DSSSB,CTET
This video is about the method of Time
Time and Work Shortcut Tricks to Solve Problems Quickly | Chocolate Method for Time and Work
If you are a 2022 pass-out then register here - https://goo.gl/XTPy4X for free career counseling and guidance for placements. Solve any time and work question ...
Time and Work Maths Shortcut Tricks | समय और कार्य का खेल
Time and Work Maths Shortcut Tricks | समय और कार्य का खेल | Time and Work TrickS by Sahil Sir Use Referral Code “SAHIL10”
Time And Work Problems Shortcuts and Tricks [In Hindi] Part - 1
Concept of Time and Work is very important for every competitive examination like IBPS PO SBI PO CAT SSC CGL etc. Like Our Facebook Page: ...
Time and Work - Concepts and Tricks - Part 1 [HD]
In this online aptitude lecture, lets solve some aptitude problems on Time and Work which appear in BANK PO, GATE,XAT, MAT and CAT exams. Problems on ...
Time and Work Problems Tricks | SSC CGL 2021 | Maths by Dhasu Sir
To Get discount Off on ALL PRODUCTS Use CODE ::Y167 SSC CGL 2019 Maths: Attend this Maths Class by expert faculty of Adda247. Here in this Maths class ...

Posted in math mathematics time work math tricks 

5001 views


Share

Facebook comments 〉

संज्ञा Clinical toxicology: poisoning and antidotes